We had a beautiful nearly full week of weather here, Monday was wet and warming up, but Tuesday, Wednesday and Thursday (today) were glorious, highs of about 20 degrees each day, with sunny skies.
I finally cut and installed a 2x8 end beam which attaches to three of the four main deck beams (It doesn't span the four as I am leaving space for a suspension bridge to a third tree. Yes I am a bit crazy!) This end beam provides strength, alignment and proper spacing for the three deck beams. I decided that the deck of the treehouse would be irregular in shape, so this end beam is set at about a 65 degree angle to the deck beams, which made for an interesting couple of hours measuring, cutting, and installing. A bit of ingeneuity was required to singlehandedly install a 14ft long 2x8 (weighing about 40 lbs) seven feet above ground with no support!
More of the 2x6 floor joists have been raised and installed, and some brackets to prevent unwanted flex or movement have also been installed where necessary. The two steel sliders for the main support beams over the wooden bracket on the small tree have also been painted, drilled, and installed. It seems the weather is going to turn to more wintry conditions, so I am looking to finish the floor joists, and hopefully the main support for the platform on the smaller tree before the end of November.
I finally cut and installed a 2x8 end beam which attaches to three of the four main deck beams (It doesn't span the four as I am leaving space for a suspension bridge to a third tree. Yes I am a bit crazy!) This end beam provides strength, alignment and proper spacing for the three deck beams. I decided that the deck of the treehouse would be irregular in shape, so this end beam is set at about a 65 degree angle to the deck beams, which made for an interesting couple of hours measuring, cutting, and installing. A bit of ingeneuity was required to singlehandedly install a 14ft long 2x8 (weighing about 40 lbs) seven feet above ground with no support!
More of the 2x6 floor joists have been raised and installed, and some brackets to prevent unwanted flex or movement have also been installed where necessary. The two steel sliders for the main support beams over the wooden bracket on the small tree have also been painted, drilled, and installed. It seems the weather is going to turn to more wintry conditions, so I am looking to finish the floor joists, and hopefully the main support for the platform on the smaller tree before the end of November.