Got back to construction after getting a few other home improvement projects started or finished as the case may be. The four floor deck beams that will support the floor joists under the main treehouse have been put in position, and fixed in place with metal framing flanges. It took quite a while to figure out how best to locate and fasten them, since the twin main beam supports will constantly move away from one another over time. The tall sawhorse support is temporary, and will be removed as soon as the permanent support fixed to the tree trunk is designed and installed. I am mulling over a few different design options, as this single brace will have to support a large portion of the treehouse deck frame, which will extend out approximately 10 feet from the main tree. I have finished the design of the staircase which will rise around the smaller tree to a landing platform there, and hope to begin building those, and the platform next week sometime.
No comments:
Post a Comment