Rudi and I continued with more wall framing and second floor joists, as well as some OSB sub floor on the second (or attic) floor. Rain was forecast, so I wanted to get a rubber tarp over the second floor to protect it and the shed pine laid as the finish floor below. Some clear garbage bags offer a bit of additional rain protection
No comments:
Post a Comment